BYYB Forums

Full Version: vacationer progress
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
I now have the upper rub rails fitted, and the hull sides trimmed. The main hatch is all glued up, and work continues on the stringer war in the cockpit. Photos to follow soon...
tomorrow will be a goo fest, as I have upper and lower rub rails ready to glue. I also have all of the stringers fitted in the cockpit area, and am working on the interior fittings. Photos to follow
Four hours of work, and the lower rub rails are glued in place. In and out of the cabin and cockpit repeatedly. The worst was the screws that were ahead of the forward bulkhead...
I now have the inside cabin floor glassed, and the hull sides in the cabin epoxied. I also have the hatches ready for glass. Most of the interior pieces are fitted and ready for gluing.  all of the pieces are coming together...